Provision of project management services to the Gauteng Partnership Fund (GPF) for monitoring Professional Resources Teams (PRTs) working on the Upgrading of Informal Settlement Programme (UISP). Morad consulting (Pty) Ltd holds the office of Project Management Office (PMO) on behalf of the agency.
TURNKEY SOLUTION OR DOLOMITE CONDITIONS, SINKHOLES REHABILITATION, INFRASTRUCTURE REFURBISHMENT AND RECONSTRUCTION PROJECTS IN MERAFONG CITY LOCAL MUNICIPALITY
Project Value – R118 075 349.98
Scope of Assignment
a) Geotechnical investigations, consolidation, and compilation of the final report
b) Final location of the construction site for the affected infrastructure
c) EIA investigations and compilation of the final report where necessary
d) Appointment of all specialized services and contractors
e) Projects implementation from concept to close out stages
f) Preliminary Design reports and presentations to the client for approval
g) Detailed design reports and presentation to the client for
approval
h) Project management and Engineering services
i) Project construction and supervision with Quality control
j) Project costing and financial management with revision and
resubmission of the business plan where there is an anticipation of project variations
k) Close out report with the As built and operational manuals
Project under this programme included,
a) Adatta rehabilitation of sinkhole
b) Khutsong extension 3 outfall line reroute
c) 590 Khutsong sinkhole rehabilitation
d) 590 Khutsong sewer pipe line reconstruction
e) Blue bell street sinkhole rehabilitation
f) Blue bell street water pipe reconstruction
g) Carletonville 007 Reservoir pipeline bypass refurbishment
h) Carletonville 007 Reservoir sinkhole rehabilitation
i) Geotechnical investigation at Carletonville, Adatta and
Khutsong reservoir and all sites.






RELOCATION OF KHUTSONG RESERVIOR WITH BULK INFRASTRUCTURE
Project Value – R70 000 000.00
Morad consulting was appointed to relocate Khutsong reservoir with the bulk infrastructure,
constructing Guard house along with pump station & access road to the reservoir.
Scope of Assignment
1. Geotechnical Investigation and Compilation
of Final Report
2. Final Location of the acceptable Construction Site
3. EAI Investigations
4. Preliminary Design Report
5. Detailed Designed
6. Project Construction Supervision
7. Project Management and Engineering Service
PREPAID METERS
Project Value – R 68 000 000.00
Scope of Assignment
1. Supply of 39,000 Prepaid / Conventional Metering System
2. Installation of the 39,000 Prepaid Meters
3. Maintenance of the 39,000 Meters
4. Reading on monthly basis of these meters, produce relevant consumption records
5. Supply of a reliable management software and licenses
6. Supply of vending unit and tokens or purchase cards
7. Training of local labour
8. Use of SMME or co-operative to be restricted to a maximum of 10% of the contract amount
RESERVOIR STRUCTURAL STABILITY AND GEOTECHNICAL INVESTIGATIONS INCLUSIVE OF SINKHOLE REHABILITATION
Project Value – R26 000 000.00
Scope of Assignment
a) Khutsong Ext.2 (Skopas) Collapsed Sewer Line – Rehabilitation of a sinkhole and rehabilitation of the collapsed sewer pipeline.
b) Khutsong: Mzwanzwa Street Outfall Sewer Pipeline Bypass
– Rerouting of an existing sewer pipeline to bypass existing sinkholes;
– Detailed Geotechnical Report on the ground condition and the extend of the sinkholes including the rehabilitation process.
c) Onyx Street Bulk Sewer Pipeline Replacement
– A detailed Geotechnical Report on the ground condition on the extend of the sinkhole including a method a statement that would inform the sinkhole rehabilitation
– Rehabilitation of the sinkhole with approximate dimensions at 6m length x 1.5m wide x 2m deep.
– Replacement of one hundred and fifty meters of 150mm diameter sewer pipeline.
RESERVOIR STRUCTURAL STABILITY AND GEOTECHNICAL INVESTIGATIONS INCLUSIVE OF SINKHOLE REHABILITATION
Project Value – R21 000 000.00
Scope of Assignment
a) Khutsong Reservoir – conducting structural integrity and geotechnical investigations on the existing reservoir and water tower
b) Carletonville Reservoir (007) – structural integrity investigation of the reservoir, detailed geotechnical investigation of the founding condition of the reservoir, as well as identification and extend of all sinkhole formations in the close vicinity of the reservoir.
c) Khutsong Water Tower (Chiawelo) – clearing out of rubble and refuse and rehabilitation of a sinkhole with an estimated dimension of 8m long x 6m wide x 6m deep.






WESTHAVEN CEMETERY
Project Value – R16 568 162.71
Bid IEM P 11/2016, appointment of a competent engineering contractor with a CIDB grading of 7CE or 6CEPE or Higher for the West Haven cemetery project
KHUTSONG ROAD & STORMWATER
Project Value – R12 000 000.00
Scope of Assignment
1. Report Stage
2. Preliminary Design Stage
3. Design and Tender Stage
4. Working Drawing
5. Construction and Supervision
6. Close out Report
6. Close out Report
MANAGEMENT
Project Value –
R10 000 000.00
Reference is made to our assignment as water conservation and demand management consultants on behalf of Mogale city local municipality in 2015.
MUNSIEVILLE PARK
Project Value –
R9 015 066.19
Bid IEM(P)09/201, appointment of a civil engineering contractor satisfying the public work programmer (EPWP) requirements of a CIDB grading of 6SH or 5SHPE for the development of Munsieville regional park.
REHABILITATION CARLETONVILLE LANDFILL SITE
Project Value – R8 005 269.00
Scope of Assignment
1. Installation of Bboundary Fence
2. Installation of High Mast Lighting
3. Rehabilitation of the Guard House and Office Building
4. Erection of Signage and Earthworks.
5. Normal Consulting Services
6. Construction Monitoring
7. Engineering Management Service
8. Reporting
9. OHS Compliance for Undertaking Duties on behalf of the Municipality
KAGISO ECDC
Project Value – R6 789 695.22
Scope of Assignment
– Inspection,
– Design Layout,
– Tender Document
– Project Management
SIMUNYE INTERNAL ROADS
Project Value – R6 645 826.15
Scope of Assignment
1. Report stage
2. Preliminary Ddesign Stage
3. Design and Tender Stage
4. Working Drawing
5. Construction and Supervision
6. Close out Report
COMMUNITY CENTRE
Project Value – R6 345 699.00
The Westonaria Local Municipality appointed Morad Consulting PTY (Ltd) on a project for the construction of Simunye Multipurpose Sports and Recreation Community Centre
BEKKERSDAL BUSINESS HIVE
Project Value – R6 006 028.81
Scope of Assignment
1. Report Stage
2. Preliminary Design Stage
3. Design Stage
4. Working Drawing
5. Construction and Supervisions
6. Close out Report
FACILITIES
Project Value – R3 000 000.00
An Appointment of a competent engineering contractor with a CIDB grading of 7CE or 6CEPE or Higher for Libanon landfill site to construct office block and ablution facilities at Westonaria local municipality was required.
CONSTRUCTION OF SLUDGE DRYING BEDS – KOKOSI WWTW
Project Value – R2 993 947.00
Scope of Assignment
1. Normal Consulting Services
2. Construction Monitoring
3. Engineering Management Service
4. Reporting
5. OHS compliance for undertaking duties on
behalf of the Municipality






H22/008GS
Project Value – RI 458 269.35
628 CLUSTER 2: ROLLING-OUT OF CONDITION ASSESSMENTS: DEVELOPMENT OF FACILITIES MAINTENANCE MANAGEMENT PLANS; AND PREPARATION OF PROCUREMENT DOCUMENTS FOR TERM CONTRACTS UTILIZING THE APPOINTED OF FACILITY MANAGEMENT MULTIDISCIPLINARY TECHNICAL TEAM, FOR A BAVIAANSPOORT, INDLELA, BEKKERSDAL SAPS AND CULLINAN STOCK THEFT OFFICE FOR A PERIOD OF THREE MONTHS
11 November 2022
H22/008GS
Project Value – R700 199.91
628/CLUSTER 6: ROLLING-OUT OF CONDITION ASSESSMENTS; DEVELOPMENT OF FACILITIES MAINTENANCE MANAGEMENT PLANS; AND PREPARATION OF PROCUREMENT DOCUMENTS FOR TERM CONTRACTS UTILIZING THE APPOINTED PANEL OF FM MULTIDISCIPLINARY TECHNICAL TEAM FOR: BEAUFORD WEST K9 OFFICES, KLAWER K9 OFFICES, MAITLAND POLICE CAMPUS, RAVENSMEAD POLICE STATION, BELLVILLE SOUTH OFFICES, FAURE TRAINING COLLEGE, MASIMANYANA TRAINING COLLEGE, CUSTOMS HOUSE, KOOPMANS-DE WET
HOUSE, RUST EN VREUGD, OLD TOWN HOUSE MUSEUM, SOUTH AFRICA NATIONAL GALLERY ANNEXE, BETRAM HOUSE, SLAVE LODGE, SOUTH AFRICAN NATIONAL GALLERY, SOCIAL HISTORY CENTRE, SOUTH AFRICAN MUSEUM AND PLANETERIUM; FOR A PERIOD OF 3 MONTHS
11 November 2022